| Date: |
2-18-2019 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Installed doors, checked windsheild and controls. |
|
|
Test fit doors. Added cosmetic extension to corner each side. Replaced lower hinge left door. Moved new old-stock windsheild from garage attic to work site. Went to T hangar and test fit control surfaces to their respective fixed elements. |
||