| Date: |
1-9-2016 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Finished floor panels, removed rivets. |
|
|
Made the flange bends in the floor panels, they are done for now. Loked at brace that connects to lH lower motor mount, decided to make a new one from .040 T0 and send it out with the bulkheads. Jeanne and I removed most of the remaining rivet shanks from the fuselage and miscellaneous parts. Damaged a doubler (not original parts) at the top of the RH doorpost. This will have to be replaced, but first research needs to be done as to why it is there. |
||