Date:    11-21-2013
Number of Hours:    0.00
Brief Description:    Swapped gear legs.
Removed MLG and inserted temporary legs. Stowed fuselage in back of hangar. Began disassembly of gear/wheels. Removed steps and brake lines. Removed wheel from left gear leg. Some brake parts need to be replaced. See pictures.