| Date: |
11-21-2013 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Swapped gear legs. |
|
|
Removed MLG and inserted temporary legs. Stowed fuselage in back of hangar. Began disassembly of gear/wheels. Removed steps and brake lines. Removed wheel from left gear leg. Some brake parts need to be replaced. See pictures. |
||