Date:    6-23-2020
Number of Hours:    0.00
Brief Description:    Fianl prep for wing installs.
Sam shortened the bushing and got the bellcrank pivot bolts installed. I tightened them and inserted travel limit pins.

I photographed all the old interior pieces and packed them away in a box on the shelf. Then swept the hangar and rearranged to make space for wing installation.

New prop arrived and Jeanne brought it down to the hangar for storage.