| Date: |
3-20-2014 |
|
| Number of Hours: |
0.00 |
|
| Brief Description: |
Continued left wing prep. |
|
|
Worked with Jeanne in afternoon. Drilled to #30 and deburred all fabric attach holes. Installed wiring for nav lights and future strobes. Modified pitot opening cover to fit. Began installation of pitot /static plumbing. |
||