| Date: |
12-30-2012 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Right Elevator ribs and tacking |
|
|
After a break foir Christmas and the stomach flu, back at it. Apparently I still haven't remembered to bring the camera in the shop with me. This session was fitting the T-25 ribs for the right elevator and doing a preliminary tacking of the parts. |
||