| Date: |
1-12-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Laying out bottom crossmembers - Part 2 |
|
|
Measure, cut, trim, fit, grind, fit, grind, fit, repeat ad nauseum.... The first picture illustrates the point made earleir about the intersections of diagonals and longerons. The second picture shows where I labeled each tube for station and direction. I have to remove each tube and drill a hol at the intersection points so I can spread some oil around in side after welding to prevent corrosion. The third picure shows one of these holes. |
||