| Date: |
10-31-2015 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Installed components. |
|
|
Continued with landing gear lights, breakers, switches, etc. The shower of sparks sytem took a lot of time to wire up. Resistors were required for the Dynon 120 (RPM) and the control box I purchased was a 24v so we had to add a step down transformer for it. |
||