| Date: |
12-31-2017 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Elevator - Right: Assembling the frame |
|
|
Rivet E-709 to E-702 (flush heads forward). - This should have been so easy to rivet. But the location proved difficult to squeeze and a little flimsy to buck. - I ended up squeexing the rivets. - Image 1 Rivet E-703/E-704 to E-702. |
||