Date:    12-31-2017
Number of Hours:    1.00
Brief Description:    Elevator - Right: Assembling the frame
Rivet E-709 to E-702 (flush heads forward).

- This should have been so easy to rivet. But the location proved difficult to squeeze and a little flimsy to buck.
- I ended up squeexing the rivets.
- Image 1

Rivet E-703/E-704 to E-702.