| Date: |
3-18-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Vertical Stabiliser - Assemble and Match Drill |
|
|
Cleco the VS-808PP spar doubler to the VS-803PP rear spar. Then cleco on the hinge brackets VS-410PP, VS-411PP and VS-412PP (See Exploded Iso View). The VS-410PP hinge brackets have two holes missing from the pattern. Use the holes in the spar channel and spar doubler as drill guides and back-drill the entire six-hole pattern through the upper VS-410PP only. The corner holes in the lower VS-410PP will be drilled for bolts later, in assembly with the fuselage (See DWG 27/27A). Prepare the ribs VS-704, VS-705, VS-706 and VS-707 (See “Edge Finishing”, “Fluting and Straightening Ribs and Bulkheads”, Section 5.2 & 5.13). Cleco the ribs to the front and rear spars. Final drill #30 VS-808PP, VS-410PP, VS-411PP and VS 412PP to VS-803PP. Drill all rib to spar attach holes to #30. Cleco on the VS-801PP / VS-901 skin. Drill / match drill to final size all the holes attaching the VS-801PP / VS-901 skin. |
||