Date:    11-22-2019
Number of Hours:    1.50
Brief Description:    Aluminum leading edge
Gluing nose ribs into aluminum leading edge. Put it on the higher elevation to get a warmer temperature for faster epoxy curing, it is kind of cold on the floor.