| Date: |
11-22-2019 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Aluminum leading edge |
|
|
Gluing nose ribs into aluminum leading edge. Put it on the higher elevation to get a warmer temperature for faster epoxy curing, it is kind of cold on the floor. |
||