| Date: |
3-16-2012 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Wing assembly (Left) |
|
|
Rivet Left wing top skins in place. Prep walkway doubler check fit and rivet. Anti colision light wiring and secureing completed. Fit left wing tip rib & tip sheeting. Trial fit tip close out lower sheet. |
||