| Date: |
3-30-2016 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Horizontal Stab Drilling Rear Spar! |
|
|
Again as with the front mounting points I measure and fiddled to ensure it was all level and square. Then made the big plunge of drilling the attach points. Glad I am past this step and onto the next. Tomorrow I plan to do some work on the Vertical stab and elevators. |
||