| Date: |
1-3-2016 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Pitot Tube Installed |
|
|
Got the Dynon Heated Pitot tube and SafeAir air lines for the Pitot and AoA run as well as the wire for the heat control installed. Really a straight forward install and not too many issues. |
||