KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  12-13-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Prep for the last rib riveting

Not much visible progress for today. I wiped down the inside of the right tank with MEK after vacuuming it out. There were some metal shavings left over from drilling for the return line that got stuck in the sealant. I then went over all the filet and fastener seals and did some touch up with sealant on anything that looked questionable in preparation for sealing this thing up for good. Finally, I riveted in the flop tube anti hang-up bracket that bridges the rib and stiffener for both tanks.
' style=

Hang up bracket installed

Hang up bracket installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.