KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  3-21-2022
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Side Rails (canopy deck) drilling - 5

I still needed to cut the canopy latch slots in the F-757's. After I layed out the location with the sharpy I refit it to the assembly. It was apparent that I did not cut the F-721B's completly. I still needed to trim back the flange around the cutout for the canopy latch slot.

I then counter sunk all the holes in the longeron.
' style=

F-721B properly trimmed

F-721B properly trimmed

' style=

Drill the corners/route the sides

Drill the corners/route the sides

' style=

Looks good

Looks good

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.