KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  3-19-2022
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Side Rails (canopy deck) drilling - 3

Moving over to the other side of the fuse, I drilled the side rail and F-757 through the longeron and F 705 bulkhead,

Next was the F-721A forward canopy. Per the plans, the fastener line should be 7/16" from the vertex of the longeron. I measured and drew a line to line up the pre drilled holes to the longeron. I couldn't figure out a good way to clamp it into position. Best I could do was one C-clamp near the aft end. I then carefully drilled the most aft hole and put a cleco in. Then the same for the most forward hole. With the part now set in position I drilled the rest of the holes.
' style=

Right side drilled

Right side drilled

' style=

Mark the fastener line

Mark the fastener line

' style=

Clamp and drill

Clamp and drill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.