KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  3-18-2022
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Side Rails (canopy deck) drilling - 1

I never did complete the end modifications for the F-721B aft canop deck parts for my tip up canopy configuration when I drilled these during the longeron fabrication. I think at the time I couldn't figure it out what to do from the drawing. But I struggled through it because you can't fit them to the F-705 bulkhead, longerons, and F-757's until you do.

Next I laid out and drilled the 3 additional holes through the longeron and F-757.
' style=

Markup of the trim required

Markup of the trim required

' style=

One end done

One end done

' style=

laying out the three additional holes in the longeron to F-757-S

laying out the three additional holes in the longeron to F-757-S

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.