KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  9-24-2021
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Started the pickup process on the forward fuselage

I started on the laundry list of pickups to take care of before I can take everything apart prior to riveting.

I opened up three pilot holes to full size and cleaned up the holes.

The first was the 1" hole for the fuel line that goes throught the side skin and main gear doubler. I used a 7/8" inch hole saw for this and opened it up to 1".

The second was the 7/16" hole for the fuel vent line fitting.

The third was the 5/8" hole that goes through the side skin and F-715 Seat Rib.

I am starting to think about how complicated it is going to be to keep track of all the dimpling/countersinking etc while I wrap this up.

Next I need to open some holes up for the main gear weldments.
' style=

Fuel (& brake line?) line hole

Fuel (& brake line?) line hole

' style=

Fuel Vent line fitting hole

Fuel Vent line fitting hole

' style=

Pitot Tube/wiring hole

Pitot Tube/wiring hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.