Brief Description: Prime and Rivet pitch servo backet
My elbow and forearm were bothering me while solo riveting the mid fuselage so I thought I'd take a break and finish up getting the pitch servo bracket installed. This needs to be done before I join the mid fuse to the aft fuse anyway.
So it was a quick part scrub, etch, and prime. After it was dry it was pretty easy to get to all the rivets with the squeezer. It would of been another thing to rivet this in with the bulkhead and brace already riveted in.