I started riveting in the tail cone area off of the main assembly. First thing I did was rivet on the tail down AEX with the squeezer. Access is obviously good for this at this point. I have already drilled the four pilot holes for the vertical stabilizer so hopefully that works.
I used the 2X gun and tungsten bucking bar. I had to drill out 3 rivets and replace. A little rusty I guess.