KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  5-4-2014
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Right Leading edge prep

I scrubbed the LE skin with dawn detergent and then metal prep. For the ribs, I scrubbed them with metal prep and then painted them with Alodine 1201. I let everything dry (which was tough since it was raining all day), and then primed with SEM. I clecoed everything together after it all dried. I should be ready to start riveting next session.
' style=

Put it back together

Put it back together

' style=

Ready to start riveting

Ready to start riveting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.