Brief Description: Finished the Vertical Stabilizer
-Finished drilling out/removing the bad flush rivets and replacing them. -Installed 5 (2 -4’s and 3 -6’s) AN470 rivets with the squeezer to attach the ribs to the rear spar assembly -Installed the 3 pop rivets to finish off the VS!!