KitLog pro

Powered By Kitlog Pro v2.0

Dave Yost RV-4
' style=
Date:  7-5-2012
Number of Hours:  6.00
Manual Reference:  Drawing 6a
Brief Description:  Hinge layout on Vertical Stab T.E. Spar

This is my second vertical stab. Made a list of all the things I wanted to do differently. This time, I choose to drill the hinge schedule first and THEN drill the rivet pattern. This ensured that the hinges where on center line and in correct position.
' style=

Hinges in the correct place this time!

Hinges in the correct place this time!

' style=

Now drill the rest of the holes! (#40)

Now drill the rest of the holes! (#40)

' style=

SHAZAM! on center line!

SHAZAM! on center line!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.