KitLog pro

Powered By Kitlog Pro v2.0

Mikes Helicycle
' style=
Date:  4-28-2012
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Skid plugs, main rotor lead-lag

Drilled two 1/8" holes on either side of each skid end then counter sunk and installed flush pop rivets to secure the skid plugs in the skids.

In preparation for static balancing the blades, I removed the pitch links and adjusted the drag links so the blade pitch is near zero when the head is shook so the blades will find their balance. The drag link adjustment is very sensitive so very small changes are needed.
' style=

Drilling rivet holes to secure skid plugs

Drilling rivet holes to secure skid plugs

' style=

Adjusting drag link to set blade lead-lag

Adjusting drag link to set blade lead-lag

' style=

Checking blade lead-lag with digital level

Checking blade lead-lag with digital level

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.