KitLog pro

Powered By Kitlog Pro v2.0

Mikes Helicycle
' style=
Date:  12-24-2011
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Right side Wiring

Ran a 12 gauge ground wire from the main battery to the terminal strip in the bottom of the instrument pod. Ran a second 12 gauge ground wire from the starter ground bolt to the terminal strip. Ran a short braided ground strap from the terminal strip to one of the pod mount bolts and filed the powder coat down to the frame under the nut.

Installed a 14g wire from the starter solenoid to the starter switch and one from the terminal strip to the other side of the starter switch.

Made up a short wire from the backup battery to the terminal ground strip.

Right side wiring includes:

Panel +12v
Panel Ground
Starter switch
Starter engaged LED
Charging circuit +12v
Exciter/Start fuel switch
' style=

Starting to populate the terminal strip

Starting to populate the terminal strip

' style=

Starter switch wiring

Starter switch wiring

' style=

Frame grounding strap

Frame grounding strap

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.