Powered By Kitlog Pro v2.0
Mikes Helicycle
Helicycle
Controls
2-26-2011
< Previous Log Entry
Next Log Entry >
Date:
2-26-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Installing control tubes
Installed the remaining four rivets in the pedal scissor arm bearing flange.
Final installed control tube ends torquing cross bolt nuts to 40 in/lbs.
Final installed the walking beams to the frame.
Installed the swash and attached the cotrol tubes ready to adjust travel and rigging.
Directional pedal arm
Walking beams installed
Control tubes from mixer to swash
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Helicycle Home
Category
# Logs
# Hours
All
493
1363
Avionics
44
124
Cabin
72
220
Controls
30
93
Drivetrain
42
114
Electrical
44
124
Engine
48
116
Frame
11
31
Fuel system
23
59
Instrumentation
26
76
Main Rotor
42
114
Main Rotor
26
73
Miscellaneous
28
73
Paperwork
7
14
Shop Supplies
2
2
Tail
23
64
Tail Rotor
23
64
Tools
2
2
Copyright © 2001-2024 Matronics. All Rights Reserved.