KitLog pro

Powered By Kitlog Pro v2.0

Mikes Helicycle
' style=
Date:  2-12-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Install Main Trans

Installed main transmission into frame using the strap hoist.

Pipe insulation foam was used to protect the frame and trans finish during the lift.

The top bearing oil line needs re-bent to clear the bottom of the fuel tank so I removed it to allow the trans to be mounted and will need to re-shape and reinstall it.
' style=

Beginning the lift

Beginning the lift

' style=

getting closer

getting closer

' style=

Oil line won't clear tank

Oil line won't clear tank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.