Checked rough alignment of tail rotor drive shaft to check if the bearing hangers need tweaking before painting the frame. Front hanger needed approx 1/16 - 3/32 filed out in the bottom to allow the front bearing to be lowered to get the shaft straight. Rear hanger will only need minor filing of the bearing clamp holes to move it slightly to the right.