Powered By Kitlog Pro v2.0
Mikes Helicycle
Helicycle
All
2-26-2011
< Previous Log Entry
Next Log Entry >
Date:
2-26-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Installing control tubes
Installed the remaining four rivets in the pedal scissor arm bearing flange.
Final installed control tube ends torquing cross bolt nuts to 40 in/lbs.
Final installed the walking beams to the frame.
Installed the swash and attached the cotrol tubes ready to adjust travel and rigging.
Directional pedal arm
Walking beams installed
Control tubes from mixer to swash
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Helicycle Home
All
Avionics
Cabin
Controls
Drivetrain
Electrical
Engine
Frame
Fuel system
Instrumentation
Main Rotor
Main Rotor
Miscellaneous
Paperwork
Shop Supplies
Tail
Tail Rotor
Tools
Copyright © 2001-2013 Matronics. All Rights Reserved.