Located and drilled 4 additional cabin attachment screws, two on each side. These will need nut plates installed on floor pan when cabin is next removed.
Decided that instrument pod needs tilted to the left about 1/2" to center it in the cabin. Will need to remove material from the bottom left edge to accomplish this.