KitLog pro

Powered By Kitlog Pro v2.0

Alaskan Bearhawk
' style=
Date:  5-30-2023
Number of Hours:  4.00
Manual Reference:  
Brief Description:  FAB Air Box Alt Air Door Part 3

Now that the proper cable location was chosen, I could finish the door on the air box. I made doublers for the ring and cable clamp. I don’t like that the thin fiberglass was going to support all of this. I assembled everything with proseal. The last thing I want is to have loose parts down the road to potentially make the trip into the engine via the injection intake!
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.