KitLog pro

Powered By Kitlog Pro v2.0

Alaskan Bearhawk
' style=
Date:  5-29-2023
Number of Hours:  4.00
Manual Reference:  
Brief Description:  FAB Air Box Alt Air Door Part 2

Other than making the initial hole for the door frame, the only other task that requires attention is the proper clocking of the door frame to the alt air door cable. But first, you have to have a cable location to make that determination and I don’t have that! So, I spent a LOT of time trying to figure out the best path for this last cable that will join the other raft of cables and wires under the instrument panel and exit the firewall at the best spot. No small task at this stage of the game!
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.