Powered By Kitlog Pro v2.0
Alaskan Bearhawk
Bearhawk
Engine
10-10-2022
< Previous Log Entry
Next Log Entry >
Date:
10-10-2022
Number of Hours:
4.00
Manual Reference:
Brief Description:
Vans FAB Airbox Part 6
So for a number of hours I fussed with making a patch on the piece work. The surface area was narrow, but it had the advantage of being supported from the side, in addition to the top plate. There is an advantage being that it is non-structural.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk Home
Category
# Logs
# Hours
All
1409
4384
Avionics
23
61
Electrical
29
80
Empennage
167
416
Engine
141
499
Fabric
67
187
Flight Controls
57
148
Floats
31
125
Fuel System
29
87
Fuselage
380
1150
Hardware
4
16
Instruments
26
80
Interior
94
280
Miscellaneous
10
64
Paint
131
518
Prop
1
1
Tools
26
107
Welding
5
13
Wheels/Landing Gear
50
114
Wheels/Landing Gear/
50
114
Wings
88
324
Copyright © 2001-2024 Matronics. All Rights Reserved.