KitLog pro

Powered By Kitlog Pro v2.0

Alaskan Bearhawk
' style=
Date:  3-5-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Door Sills - Part 3

I finished fitting the pilot's side door sill and made sure all the measurements checked out. I then clamped everything down and tacked both ends. After that, I welded shut the cuts that formed the dog-leg in the tubing. Once that was done, I removed all the jigs and made the final measurements. The point at the dog-legs measured exactly 18 1/4 inches from the center making a total of 36.5...right where it needs to be. I then checked for level in both directions and got satisfactory numbers...dead on! I'm one happy camper! On to the rest of the diagonals. It's almost time to start thinking about final welding...
' style=

All jigged and ready to weld

All jigged and ready to weld

' style=

Level laterally

Level laterally

' style=

Level longitudinally

Level longitudinally

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.