KitLog pro

Powered By Kitlog Pro v2.0

Alaskan Bearhawk
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-9-2024
Number of Hours:  12.00
Manual Reference:  
Brief Description:  Lower Wing Strut Fairings Part 3

It took a bit of doing, but they are done. I used the cut off pieces of lift strut to hold the shape while the Chem Seal on the inside set to hold things together, and for added structure I embedded little aluminum wedges. Trying to make a curved rivet flange all the way around using one piece of 2024-T3 was way beyond my patience level. As it is it took five days to make both sides. Once painted they will have some rubber channel along the edge.
' style=





' style=




' style=




' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.