Got quite a bit done today. I fit the second door threshold tube and welded them both into place. I then was able to fit the aft boot cowl former to accomodate the additional tube. Once that was done, I installed 8-32 plate nuts in the former and tacked them into place. Once that was done, it was late and time for bed!