KitLog pro

Powered By Kitlog Pro v2.0

Alaskan Bearhawk
' style=
Date:  4-22-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Station C-S Part 1

After being gone on vacation, vehicle maintenance and redoing some things around the shop I finally got back to the BH

The next section to do is the station at C-S. It's pretty hefty tubing at .065 wall for the landing gear shock strut attach point. I made a jig according to the plans and tacked it together. The engineering change in Beartracks allows you to substitute the small piece in the middle to a thinner wall to save weight, but I just used the same thickness throughout.

Once that was done, I had to establish a reference point for the height of the top tube, along with the centerline. I did this with a level across the door threshholds, centered and perpendicular to the centerline.
' style=

In the jig

In the jig

' style=

Tight fit

Tight fit

' style=

Establishing a reference point

Establishing a reference point

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.