KitLog pro

Powered By Kitlog Pro v2.0

Wesleys Web Site
' style=
Date:  8-2-2018
Number of Hours:  2.75
Manual Reference:  Assembly prep
Brief Description:  Deburing and dimpling

Debur the forward floor structure and the forward and aft bottom skin. Rivet on the platenuts on the end of the two floor ribs

Debur and dimple the forward, mid, and aft armrest structure and verticals. Rivet on the 22 platenuts

Dimple the firewall connection points with side skin, as well forward baggage points that connect with side skin
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.