102.5 have been for the wing spars (aft and main) Aft spars R and L; 20.50 hrs Main Spars R and L: 82.50 Right: 52.5 Left: 30 So, I guess I did learn something from building the right one.
Do I now wish that I had paid for the pre-built Spars? No, I guess not. It was a bit worrisome but still fun.
Completed structures to date:
Rudder Elevators Horizontal Stab Vertical Stab Wing tips for all tail structures Aft Spars right and left Main Spars right and Left