KitLog pro

Powered By Kitlog Pro v2.0

Alaska Sonex
' style=
Date:  9-29-2010
Number of Hours:  6.50
Manual Reference:  
Brief Description:  Control sticks, etc.

Completed install of the dual control stick assembly. Connected elevator control linkages. Lubricated all. Cotter pins placed. Free and easy movement.

Fabricated pushrod cover to protect from foreign object contact with the elevator mechanism. Installed nutplates to secure.
Completed routing of PTT buttons. Wiring secured. All is functional.

Fabricated bungee to assist in neutral elevator placement per instruction.

Visible in the image is my EFIS back-up battery.

Installed the lap restraints. Simple.
' style=





' style=

Black cable/spring is for trim

Black cable/spring is for trim

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.