Completed install of the dual control stick assembly. Connected elevator control linkages. Lubricated all. Cotter pins placed. Free and easy movement.
Fabricated pushrod cover to protect from foreign object contact with the elevator mechanism. Installed nutplates to secure. Completed routing of PTT buttons. Wiring secured. All is functional.
Fabricated bungee to assist in neutral elevator placement per instruction.