Powered By Kitlog Pro v2.0
WAYNE'S WEB SITE
RV-8
Empennage
12-12-2018
< Previous Log Entry
Next Log Entry >
Date:
12-12-2018
Number of Hours:
4.00
Manual Reference:
6-12
Brief Description:
Built trim tab
Built elevator tab. Trimmed and mounted hing on trim tab, then positioned hing on elevator flange and match drilled.
Trim tab moves free through 45 degrees.
Aft edge aligned well with good gap
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
123
423
Elevators
25
73
Empennage
15
44
Fiberglass/Composite
5
11
Horizontal Stabiler
22
60
Intro
1
1
Rudder
11
44
Shop Tools
4
17
Vertical Stabilizer
9
38
Wings
31
135
RV-8 Home
Copyright © 2001-2024 Matronics. All Rights Reserved.