Powered By Kitlog Pro v2.0
Waynes Bearhawks
4-Place Bearhawk
Fuselage
4-7-2011
< Previous Log Entry
Next Log Entry >
Date:
4-7-2011
Number of Hours:
4.00
Manual Reference:
Brief Description:
Right wing ready
I plumbed the left tank aux tank to the main tank. Also I finished installing the inspection ports and the landing light brakets on the right wing. Both wings are done now and ready to come out of the jig.
Aux Tank Plumbed to Sight Gauge
Right Wing
Both Wings Ready to Come Out of Jig
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Bearhawk LSA Home
4-Place Bearhawk Home
Category
# Logs
# Hours
All
509
2633
Ailerons
20
100
Aux Fuel Tanks
32
168
Electrical
1
8
Flap/Aileron Hinges
13
78
Flaps
18
106
Flight Controls
21
115
Fuel System
32
168
Fuselage
86
468
Miscellaneous
13
15
Ribs
36
190
Spars
57
303
Tail
30
157
Wing Assembly
40
216
Wing Skinning
92
442
Wing Steel Parts
18
99
Copyright © 2001-2024 Matronics. All Rights Reserved.