Brief Description: Welded LG strut attach, started parts for legs
I welded on the center attach point brackets for the landing gear struts. That finishes up all the hardware that needs to be welded to the fuselage for the landing gear attachment points. I drilled out all the holes to 3/8" - they were 1/4" prior.
I started making the parts for the landing gear legs. I cut and fit the 9/16" tubes that will be the top of the legs - then I drilled them out to 3/8" for the attach bolt.