Date:  5-31-2011
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Station M cluster, started verticals

"I put the cross tube with the peak in at station M. I added the 4 diagonals. Getting the last two in was kind of tricky. I just had to trim a little more off and force them in. It doesn't leave a tight fit but I don't see any other way to get them in. Having the little 3"" HF grinder was handy. Instead of having to climb up and down from the table to trim the pieces to fit I just kept the little grinder at my feet and would grind off as I needed.

With the top frame now done I started at the back and started adding the vertical tubes. I got 3 stations done."