KitLog pro

Powered By Kitlog Pro v2.0

Bills Web Site
' style=
Date:  2-13-2010
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Elevator

Attached trim cover to bottom of elevator. Torqued counterweight bolts. Began rolling leading edges of the left elevator with the help of my lovely but clueless assistant, Jeanne. I used a 1" diameter broom handle and aligator tape. These hi-tech tools produce very good results. I quickly discovered rolling one section at a time is much easier. I inadvertently installed the bottom skin over the top only to discover my error. It only took a fiew minutes to drill out the pop rivets and correctly complete the installation. Installing the top skin over the bottom will shed water properly.
' style=

Rolling left elevator leading edge

Rolling left elevator leading edge

' style=

Rolling one section at a time

Rolling one section at a time

' style=

Pop rivet installed after rolling top & bottom skin

Pop rivet installed after rolling top & bottom skin

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.