KitLog pro

Powered By Kitlog Pro v2.0

RV-7
' style=
Date:  7-19-2014
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Final prep of right wing for bottom skinning

Finished up the install of the aileron gap fairling and the flap brace on the trailing edge of the right wing. Installed the aileron bellcrank and Dynon aileron servo and linkage. Torqued and safetied most all nuts, except for the main pushrod connection. Touched up primer on countersunk holes for the flab brace.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.