Powered By Kitlog Pro v2.0
RV-7
RV-7
Empennage
11-22-2015
< Previous Log Entry
Next Log Entry >
Date:
11-22-2015
Number of Hours:
7.00
Manual Reference:
Brief Description:
Elevator attach drillings
Drilled the brackets into the longerons for forward and aft horzontal stab.
Installed the VS and drilled the upper attach bracket (took 3 tries to get this one right) All edge distances were carefully checked and came out with good margin.
Stab afdtr attach
Rudder stop
VS attach
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2024 Matronics. All Rights Reserved.