Powered By Kitlog Pro v2.0
RV-7
RV-7
Avionics
11-21-2017
< Previous Log Entry
Next Log Entry >
Date:
11-21-2017
Number of Hours:
6.00
Manual Reference:
Brief Description:
GAD27 wire arrangement
Sorting and arranging the wires from the various cable runs that connect to GAD27 interface. Arranging them to form a nice service loop, so not to bend them at too tight of a radius.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
495
2357
Avionics
33
180
Empennage
74
222
Engine
35
180
Finishing
93
533
Firewall forward
30
136
Fuselage
117
665
Miscellaneous
3
2
None
1
6
Prop
1
3
Service Bulletins
4
19
Tanks
27
92
Tools
7
11
Wings
70
308
Copyright © 2001-2024 Matronics. All Rights Reserved.