KitLog pro

Powered By Kitlog Pro v2.0

RV-7
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-7-2019
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Cowling smooth prime II

Time to sand the cowl. Applied smooth prime, both with sprayer and roller. After curing, applied a power guide coat to the surface and went to work with the orbital sander. Slow going with 320 grit sandpaper, but with the guide coat, it was easy to tell where more sanding was needed. Each cowl went through 3 cycles. Produced a very nice surface.
' style=

First coat of smooth prime

First coat of smooth prime

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.